                仙台市南蒲生浄化センター    災害復旧工事
  工事データ/   GL〜橋面迄の高さ:7.6m  橋長:527.5m(総延長)   幅員:12.0m  許容上載荷重:898KN   (揚力80tonのクローラクレーンを想定)
 
  | 
               
             
           | 
         
        
            | 
            | 
            | 
         
        
          |  
            
           | 
            | 
           
            
               
                MINAMI-GAMOU Sewage water      Disposal plant of SENDAI-city. (North-East Japan disaster restore project)
  Data/  Hight : 7.6m (25.3')  Length : 527.5m (1,758')             ...3 deckes total  Width : 12.0m (40')  Designing Top load : 898KN (For Capability 80ton's crawler crane) | 
               
             
           | 
         
        
            | 
            | 
            | 
         
       
      
  
     |